Office Hours 8 AM–7 PM Daily — 24/7 Emergency Service After Hours
1989 Opa-Locka Blvd, Opa-locka, FL 33054
Services Commercial About Service Area Reviews FAQ Contact Call 305.940.8180
Bathroom & Kitchen Remodel Plumbing

Bathroom & Kitchen Remodel Plumbing

Faucets, toilets, disposals, sinks, showers, and tubs — installed and serviced.

A remodel is only as good as the plumbing behind the fixtures. Bear Plumbing handles the rough-in and finish plumbing for bathroom and kitchen renovations — from a single faucet swap to a full gut renovation — for homeowners, contractors, and property managers.

We coordinate around your renovation timeline and other trades, and make sure fixture placement and rough-in plumbing is done right the first time, so tile, cabinetry, and finish work aren't held up or redone later.

What's Included

  • Faucet, sink, and fixture installation and repair
  • Toilet installation, replacement, and repair
  • Garbage disposal installation and repair
  • Shower and tub installation, including valve rough-in
  • New construction and remodel rough-in plumbing
  • Coordination with contractors, designers, and other trades

Signs You May Need This Service

  • You're planning a bathroom or kitchen renovation
  • Old fixtures are leaking, outdated, or mismatched
  • You're relocating a sink, tub, or toilet and need rough-in work
  • A new construction project needs rough-in plumbing before drywall

Our Process

1

Plan the Layout

We review fixture placement and rough-in requirements with you or your contractor.

2

Rough-In Plumbing

Supply and drain lines are installed to code before walls close up.

3

Set Fixtures

Once finishes are in, we install and connect faucets, toilets, sinks, and valves.

4

Test Everything

Every connection is pressure-tested and checked for leaks before we're done.

Frequently Asked Questions

Yes — we regularly coordinate rough-in timing and fixture specs directly with contractors, designers, and property managers on renovation projects.

Yes, we're happy to install customer-supplied fixtures as long as they meet code requirements for the installation.

We coordinate scheduling directly with your project timeline so rough-in inspection and sign-off happens before walls close up.

Related Services